Illustrative image – not actual.
Voyants Solutions was selected to design the new Gwalior Railway Station that will complement the existing station and attract tourism.
The firm used BIM models and workflows to optimise building design and incorporate existing structures. The company has designed a structure and development plan that will keep the existing station with all platforms fully operational during construction.
The proposed design of the railway embraces the old heritage station, which remains a focal point, and adds shell structure based on the arch of the existing building.
The company could meet these specifications with a framed structure, where multiple components could be fabricated off-site and placed in position with the help of cranes. Voyants Solutions constructed a complete BIM model using Bentley software.
The company designed the structure in MicroStation and STAAD.Pro, then created a digital engineering model in OpenBuildings Designer. The design required parametric modeling, 3D modeling, and animation.
The company made use of building energy modeling technology to optimise natural light and minimize the heat gain of the building.
A team of five designers at Voyants Solutions prepared the plan set and 3D model for this project in one month.
