Dravyavati River Rejuvenation Project inauguratedIllustrative image – not actual.

Chief Minister of Rajasthan Vasundhara Raje inaugurated Dravyavati River Rejuvenation Project on 2 October 2018. The project, which has been executed by Tata Projects, is a 47.5 km rain-fed riverfront that had degenerated into an untreated sewage nallah which was restored as a perennial river fed by treated clean water.

The inauguration ceremony was performed for 16 km stretch of the total 47.5 km stretch. The project intends to reduce pollution, treat 170 million ltr of sewerage a day, create green spaces, social spaces, cycle tracks, jogging tracks along its banks, reduce the threat of floods, create employment, and transform Jaipur into a clean Smart City.

A pathway and a cycling track of nearly 38 km on both sides of the river has been provisioned to serve as a means of healthier living through exercise and clean air.

Three gardens have been developed at the Bird Park in Sikar Road, Landscape Park at Shipra Path, and at the Botanical Garden in Bambala encompassing around one lakh mtr of lush green havens.

Five sewage treatment plants (STPs) have been installed along the course of the river with a combined capacity of 170 MLD.

The project provided employment to more than 30,000 persons in the construction phase. The total cost of the project is Rs 1,676 crore which includes construction cost of Rs 1,470 crore and 10 years maintenance cost of Rs 206 crore. So far work has been completed for Rs 1,290 crore.

← All press releasesBack to top →