Illustrative image – not actual.The Zojila Tunnel project reached a landmark stage with the successful final breakthrough, completing the excavation phase of the world's longest single-tube bi-directional road tunnel.
Union Minister for Road Transport and Highways Nitin Gadkari remotely triggered the breakthrough blast near the East Portal of the tunnel in Ladakh, which removed the final 2.5 metres of rock. The milestone connects the two ends of the tunnel and advances the goal of all-weather connectivity between Kashmir and Ladakh. Executed by Megha Engineering and Infrastructure (MEIL) for the National Highways & Infrastructure Development Corporation (NHIDCL), the breakthrough was completed six months ahead of schedule. Spanning 13.15 km at an altitude of over 11,500 ft., the tunnel will reduce travel time across the Zojila Pass from up to 90 minutes to approx. 15 minutes while ensuring uninterrupted access during winter months when snowfall typically blocks the route. With nearly 85 percent of overall work completed, civil construction is expected to continue before installation of electrical and operational systems.
Scheduled for opening in 2028, the tunnel will enhance regional mobility, improve logistics efficiency, support tourism and trade, and strengthen strategic connectivity along the vital Srinagar–Leh corridor, making it one of India’s most significant high-altitude infrastructure achievements.
