Zambia govt inks contract for railway lines revampIllustrative image – not actual.
The Ministry of Transport and Communication Zambia has inked USD 825 million contract with the China Civil Engineering Construction Corporation, a subsidiary of the China Railway Construction Corporation, for upgrading the existing railway lines.

These include the mainline from Livingstone to Kafue Bridge which is 420.97 km long, the branch line from Masuku to Choma which is 64.34 km long and another branch line from Livingstone to Mulobezi which is 162.95 km long.

The project will cover nearly 650 km of railway lines and will be completed in eight years. The main railway that traverses through the country currently is the Zambia Railways line from Livingstone, via Lusaka to Kitwe in the north, used by passengers and freight trains.

At Kapiri Mposhi there is a junction with the Tanzania-Zambia Railway Authority (TAZARA) that is used by freight trains, but not by passengers. TAZARA has its own passenger trains, but passenger stations of the two railways at Kapiri Mposhi are separated by a distance of around two km.

Livingstone is also the junction with Mulobezi line, and with the line from Zimbabwe via the Victoria Falls Bridge.

← All latest storiesBack to top →