Illustrative image – not actual.The Western Railway (WR) has sought assistance from the Maharashtra Government for acquiring land to complete the Churchgate-Virar elevated corridor.
The track is likely to be elevated from Virar to Mahalaxmi, but when it moves southwards, the corridor will not have enough space, according to sources. It is either to be built underground or follow another route as there are many buildings en route. Besides, the WR also plans to take the corridor to Nariman Point.
Therefore, land has to be acquired for this. Besides, a huge plot of land is to be given at Virar for the depot.
Related Links:
Project profile
