Works on cable-stayed bridge on fast modeIllustrative image – not actual.

Work on the cable-stayed bridge at the Western Expressway Highway is on fast track.

The cable-stayed bridge is part of the Versova-Andheri-Ghatkopar metro rail being constructed by Mumbai Metro One. The bridge has a rail height of 22 mtrs from the ground level and total height up to the top of pylon is 38 mtrs.

At present, the piling and staging works of Andheri side of the bridge is over.

Related Links:
Project profile

← All latest storiesBack to top →