Work commences on drinking water supply project in CéchiIllustrative image – not actual.
The government of Côte d’Ivoire has begun a drinking water supply project in Céchi.

As of now, 2D Consulting Afrique, a firm specialising in environmental and sustainable development strategy and corporate social responsibility, has already started the environmental and social impact study of the drinking water project.

This includes the collection of data in the field and public consultation that will take into account the positive and negative impacts of the project on its surrounding environment.

Other than Céchi, where drinking water will be supplied through an urban hydraulic system, the project will also benefit the inhabitants of the sub-prefecture capital of Pacobo.

This drinking water supply project is part of a programme ‘Water for All’ which was launched by the West African country government in 2017.

The programme is meant to improve drinking water accessibility to all inhabitants of Côte d’Ivoire by 2030, through establishment of mechanisms for rational and sustainable management of available water resources.

The programme will be implemented in two phases. Phase-I which is already ongoing includes construction of 200 water towers and 8,000 new village pumps, as well as  repair of 21,000 existing village pumps and connection of 4,50,000 households to the network of the water distribution company of Côte d’Ivoire (Sodeci).

When complete, by the end of 2020, this phase will increase drinking water coverage to an average of 82.5 percent in the country, with a level of 60 percent for rural areas and 85 percent for urban areas.

Phase-II will cover all structural projects, extensions, and densification of drinking water supply network in large cities.

← All latest storiesBack to top →