Illustrative image – not actual.
The construction on a mountain tunnel has begun as part of the C-4 package, a key development for the Mumbai-Ahmedabad high-speed rail network (MAHSR). This tunnel, located around one km from Zaroli hamlet in Umbergaon, Valsad district of Gujarat, is the only tunnel included in the aforementioned package.
The C-4 package involves the design and construction of a 237 km viaduct linking Vapi and Vadodara, which includes four stations: Vapi, Bilimora, Surat, Bharuch, and the Surat depot.
The mountain tunnel stands out as a critical component among these elements. The tunnel structure consists of the tunnel itself, the tunnel portal, and other connecting structures such as the tunnel entrance hood. The New Austrian Tunnelling Method (NATM), as well as six other mountain tunnels within the MAHSR line, will be employed in the creation of this tunnel to ensure the highest construction standards.
The mountain tunnel boasts impressive features, including 350 mtrs. long, 12.6 mtrs. wide, 10.25 mtrs. tall, and has a remarkable single tube horse-shoe design. It will have two tracks for smooth and efficient passage along the high-speed rail corridor.
