Widening, repairing of road project, to begin soonIllustrative image – not actual.

The repairing and widening work of the national highway stretches including NH-34 and NH-31D in West Bengal is likely to take off soon.

 

Work on the bridge over Hatania-Doania section on NH-117 in South 24-Parganas is likely to begin soon along with work on the bridge over Fulher river in Malda. Both the projects will cost around Rs 400 crore.

 

Also, the NH 31D repair and widening work will begin with an estimated cost of Rs 70 crore. The NH-31D is a 155 km long stretch from Ghoshpukur to Salsalabari and passes through Darjeeling and Jalpaiguri districts.

 

Besides, widening of the NH-34 stretch is facing problems at several points.

 

Meanwhile, widening of the stretch from Airport to Barasat will also commence with central funds.

← All latest storiesBack to top →