Illustrative image – not actual.Western Railways is planning to set up solar panels at Churchgate station, in order to conserve and produce energy emitted out of the solar panels.
It is estimated that the energy produced out of the solar panels will be six times the amount the station consumes every year. The excess electricity produced will be given back to the grid.
Around 2,600 sq mtr area consisting of the roof of the Churchgate building will be covered with the solar panels. The solar panels are estimated to produce 100 kW of electricity (approx 150 lakh in terms of units).
At present, the energy conservation project is in the proposal stage and work on the project is likely to be completed by the end of 2014.
Besides, depending upon the success of the Churchgate project, a similar plan is likely to be rolled out for other stations like Mumbai Central and Andheri.
