Illustrative image – not actual.Close on the heels of launching the Acharya Jagdish
Chandra Bose Flyover on 19 August 2003, the West Bengal government is
planning to implement innovative solutions to decongest railway and roadway
traffic in Kolkata and Howrah.
The government is in talks with some
select companies in Japan and Thailand for solutions that would replicate the
speed and efficiency of Kolkata’s Metro railway system underground as motorised
transport like buses was clearly not the way forward for the narrow roads and
congestion. An integrated transport plan was also being worked out.
It is likely that the century-old
tramways system could be replaced by electrically-propelled mass transit
systems like sky-trains or similar elevated systems along with ground level
electric trolleys. The city’s unused canal network, currently being dredged,
could also be used.
Meanwhile, the Metro system, that currently
runs from Dum Dum to Tollygunge, is also being expanded at its northern end to
the city’s airport and at the southern end to the suburb of Garia.
The existing north-south Metro system serves about 5 lakh
passengers daily. Kolkata has a population of 1.1 crore and receives about 30
lakh workers every day through its suburban railway system to the heart of the
city.
