Illustrative image – not actual.A number of projects involving huge investments, are planned to be undertaken in West Bengal's shipping infrastructure sector during the 10th Plan (i.e. 2002-07).
During the said period Kolkata Port Trust (KPT) plans
to invest Rs.1,584 crore. Of this amount, Rs.314 crore would be under the port
account, while the remainder is expected to come in from the private sector,
captive users, etc. Besides this, Rs.350.35 crore would be spent for river
regulatory measures during the period.
Investments to the tune of Rs.862 crore are also
planned for the Kolkata Dock System (KDS) and another Rs.722 crore for the Haldia
Dock Complex (HDC).
The projects that will be taken up during the 10th
Plan include development of a second dock arm with an investment of Rs.130
crore, development of road infrastructure, improvement of back up area with
railway connectivity inside the dock and procurement of one ship-shore gantry
for container handling. Construction of berths No.14 to No.18 in the second
dock arm of HDC on build, operate and transfer basis, estimated to cost Rs.225
crore, would also be taken up.
The new schemes for KDS included construction of
break water and groyne at Saugor Island, modernisation / upgradation of VTMS, procurement
of one trailer-suction hopper dredger, replacement of swing bridge, improvement
of dry dock facilities and construction of two jetties at Roychowk for handling
of liquid bulk cargo.
