Water pumping project reaches AhmedabadIllustrative image – not actual.

The water pumping project using water from the Narmada River has reached Vadodara and Ahmedabad. This project has been completed within 120 days at a cost of Rs.43 crore.

 

Water from the Narmada River, which was pumped into the 460 km main canal of the Sardar Sarovar Project on 23 February 2001, has covered 150 kms to reach Vadodara and Ahmedabad.

 

Water through the canal is expected to reach Saurashtra by 31 March 2001 through a Rs.800 crore pipeline.

← All latest storiesBack to top →