Waaree Energies solar plant in GujaratIllustrative image – not actual.

Waaree Energies has bagged an EPC contract to set up a 75 MW solar project in Gujarat.

The scope of the work includes design, manufacture, supply, installation, operation and maintenance of the solar power plant, which is scheduled to get commissioned by March 2016.

← All latest storiesBack to top →