Volkswagen starts engine assembly line at Chakan plant Illustrative image – not actual.

Volkswagen has established a new diesel engine assembly line and a full-fledged engine testing facility at its Chakan plant, near Pune.


The new line can assemble over 98,000 engines in a three-shift-system at full capacity. The locally assembled engine will be used in the recently launched new Polo and the Polo GT TDI.


Volkswagen India has invested 30 million Euro (approx Rs 240 crore) in this first step of engine assembly and production of parts and components, with suppliers in India.


The assembly of the new 1.5 ltr TDI diesel engine, which was designed specifically for the Indian market will commence at the end of 2014.


With an initial investment of 580 million Euro and an additional investment of 100 million Euro, Volkswagen India’s Chakan plant is, so far, the single largest investment of a German company in India.


The facility houses the entire automotive production process, from the press shop, body shop, paint shop and assembly, along with an in-house R&D facility.


 

← All latest storiesBack to top →