Illustrative image – not actual.The Union Government has approved the proposal of the Haryana Government for viability gap funding (VGF) in state highway projects.
The government has approved Rs 110 crore of VGF for the Yamunanagar-Ladwa section of state highway (SH)-06 and the Ladwa-Karnal section of SH-07, including Ladwa bypass, on DBFOT basis. The total project cost is Rs 396 crore.
The state government, through PWD has taken up the project involving widening from two-lane to four-lane divided carriageway configuration from 39.305 km (near Yamunanagar) to 58.900 km (junction of proposed Ladwa bypass) of SH-06 and from 0 km (Near Karnal) to 29.964 km (junction of proposed Ladwa bypass). It will also consist of a new four laned Ladwa bypass (4 km). Total length of the corridor is 53.5 km. The project involved one byepass at Ladwa. It will connect NH-73 with NH-1. Ladwa byepass will start from Yamunanagar byepass on NH-73 to be constructed by the NHAI and will end on NH-1 (Delhi-Ambala).
The concessionaire will be responsible for operations and maintenance of the entire 53.5 km corridor till the end of concession period. The concession period is 20 years, which includes 24 months of construction period from the appointed date.
Related Links:
Project profile
