Illustrative image – not actual.Vayona Energy has secured its first wind power order in India, signing a contract with Oyster Renewable Energy for a 64.8 MW project in Kadapa district, Andhra Pradesh.
This contract marks a key milestone following the transition of Siemens Gamesa’s onshore wind business in India to Vayona Energy in December 2025. The project will deploy 18 SG 3.6-145 wind turbines, totaling 64.8 MW of installed capacity, and includes a long-term operations and maintenance agreement. Major turbine components will be manufactured and assembled at Vayona Energy’s Mamandur facility near Chennai, with supply expected to start in the first quarter of 2026. Since the launch of its 3X platform, Vayona’s cumulative order intake has surpassed 3.6 GW, with over two GW installed as of December 2025.
Vayona Energy functions as a wind turbine original equipment manufacturer across India and South Asia, managing a portfolio of over 12 GW in operational and development assets. Oyster Renewable Energy is an independent power producer that develops and operates renewable energy projects for commercial and industrial clients, leveraging hybrid solar and wind solutions.
