Vasai overbridge opened to trafficIllustrative image – not actual.

The Mumbai Metropolitan Region Development Authority (MMRDA) threw open a Rail Overbridge (ROB) connecting the eastern and western parts to facilitate smoother flow of traffic.

Scheduled to be completed by 2011, the delay forced residents to use a 50 year old ROB leading to traffic congestion and inconvenience.

Constructed at a cost of Rs 48 crore, the 736 mtr long and 11 mtr wide ROB is an addition to the already existing one, which is only 8 mtr wide and bears water pipelines and electric cables.

Now, with the new and additional arm, both bridges will be able to carry one-way traffic providing much needed relief to motorists.

← All latest storiesBack to top →