Illustrative image – not actual.
Valecha Engineering has bagged an order worth Rs 100.21 crore from the National Highways & Infrastructure Development Corporation (NHIDCL).
The scope of work involves construction of balance work of two lane with paved shoulder of Jorumkoloriang Road (NH-713) on EPC basis from the existing 50.050 km to 70.000 km (design - 44.989 km) under SARDP-NE (Package-3) in Arunachal Pradesh. The design length of the project is 16.558 km.
The project will be completed in a period of 18 months.
