Valecha Engg bags contract from NHPCIllustrative image – not actual.

Infrastructure development firm, Valecha Engineering, has bagged a contract of Rs 176.29 crore from NHPC for civil work of a tunnel in Himachal Pradesh.

 

Valecha Engineering has won a project from NHPC, for civil works of head race tunnel of Parbati hydel Stage-II power project, in Himachal Pradesh.

 

NHPC is constructing (200 x 4) Parbati hydel Stage-II power project across River Parbati, in Kullu district of Himachal Pradesh.

 

The project involves the construction of a concrete gravity dam of 91mtr height at Pulga village, an orifice type surge shaft (underground) of 130 mtr height and 17 mtr dia, 31.23 km long headrace tunnel of six mtr dia, two underground pressure shafts, each of 1,947 mtr length and 3.5 mtr dia, four tailrace channels of 60 mtr length and 4.5 mtr dia each, a power house at Suind village to accommodate four Pelton type turbine generating sets of 200 MW each, 400 kV GIS surface switchyard with two outgoing 400 kV feeders.

 

The project will generate about 3,108.66 million units of electricity, which will be shared by Himachal Pradesh, Jammu & Kashmir, Punjab, Rajasthan, Haryana, Uttar Pradesh, Delhi and Chandigarh.

 

Related Link:
Project profile

← All latest storiesBack to top →