VA Tech Wabag bags order from BWSSBIllustrative image – not actual.

VA Tech Wabag has bagged an order from the Bangalore Water Supply and Sewerage Board (BWSSB) for wastewater treatment projects which will significantly enhance Bengaluru’s water management infrastructure.

The contract covers the design, build and operate (DBO) of a 100 MLD sewage treatment plant (STP) and a 25 MLD tertiary treatment plant (TTP) at Byramangala, along with a 60 MLD STP at Bellandur. The latest award follows the company’s successful execution of the first phase of the Bellandur project and marks its involvement in the second phase. The project scope includes design, engineering, procurement, construction and commissioning of advanced treatment facilities, along with biogas-based captive power generation to improve operational efficiency and sustainability. The sewage treatment plants will use the activated sludge process integrated with a biological nutrient removal system, while the tertiary treatment plant will employ ultrafiltration technology to produce high-quality treated water suitable for discharge into nearby water bodies. The EPC phase is expected to be completed within 36 months, followed by a seven-year operations and maintenance period.

This award win reinforces VA Tech Wabag’s long-term role in supporting sustainable urban water infrastructure and environmental conservation.

← All latest storiesBack to top →