Illustrative image – not actual.
Va Tech Wabag (Wabag), in consortium with IDE Technologies, has won an order of Rs 594 crore from Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB), for construction and operation & maintenance (O&M) of a 45 million litre per day tertiary treatment plant at Koyambedu.
The value of the EPC and O&M portion of the contract is Rs 396 crore and Rs 198 crore respectively for a period of 15 years. The consortium will be responsible for execution of the complete plant and transmission pipeline where WABAG would act as the leader.
The project is a decisive step in the direction of domestic wastewater recycling thus creating alternate sources of water wherein treated water from the existing Koyambedu Sewage Treatment plant (STP) will be recycled and conveyed to various industries at Irungattukottai, Sriperumbudur and Oragadam through a pipeline of approx 72 km.
The project will adopt a state-of-the-art ultra-filtration and reverse osmosis technology to treat secondary domestic waste water to provide a consistent quality of water to various industries and the scope includes supply, laying and maintenance of MS Transmission main for conveying this reclaimed water to various industries.
