Uttaranchal Annual Plan outlay for 2003-04 finalisedIllustrative image – not actual.

Annual Plan outlay for Uttaranchal for 2003-04 has been fixed at Rs.1,575 crore including Rs.20 crore for strengthening the infrastructure in the state. The state was advised to take suitable steps to curtail the losses of Uttaranchal Power Corporation.

← All latest storiesBack to top →