Uttarakhand ropes in IL&FS for Song hydel projectIllustrative image – not actual.

The Uttarakhand Irrigation Department has roped in IL&FS as a new transactional advisor (TA) for the multi-purpose hydel project on the river Song in Dehradun district of Uttarakhand.

 

In this regard, the department has issued a LoA to IL&FS. The company will assess the viability of building the dam on PPP or BOT model. The project estimated to cost around Rs 600 crore is being proposed at Sondhana village near Maldevata area in the state. The height of the proposed Song dam is 148.25 mtrs, which will have the potential to supply water to the entire population of Dehradun for an estimated period of 50 years and produce 6 MW of power. It will be able to provide water to the state-run Uttarakhand Jal Sansthan, the nodal agency for drinking water supply, through gravitational route.

← All latest storiesBack to top →