UPEIDA plans 31-km elevated corridor linking Okhla Barrage to Yamuna ExpresswayIllustrative image – not actual.

The Uttar Pradesh Expressways Industrial Development Authority (UPEIDA) and the State Irrigation Department inspected the Yamuna Pushta road on 10 March, 2026 to evaluate the feasibility and alignment of a proposed elevated corridor.

The 31.2-km, six-lane elevated road will run from Okhla Barrage near Sector 94 to the Yamuna Expressway near Gharbara village, opposite Gautam Buddha University, and is planned as an alternative route to ease traffic expected to rise sharply once the Noida International Airport becomes operational. The corridor will follow the Yamuna embankment, link central Noida sectors, cross the Hindon river, and merge with the Yamuna Expressway, with three loops proposed for better access to adjoining areas. It will pass through Sectors-95, and 125-135, covering offices, institutions, and residential complexes. UPEIDA officials, led by CEO Krishna Karunesh, confirmed the inspection, noting that the road will enhance connectivity from Noida to Greater Noida and Jewar.

A three-member team from Almondz Global Infra will assess technical and environmental aspects, after which a detailed project report will be prepared. Construction is expected to take two years, with costs shared by Noida, Greater Noida, and Yamuna authorities.

← All latest storiesBack to top →