Illustrative image – not actual.
Uttar Pradesh Chief Minister Yogi Adityanath inaugurated the 91.35-km Gorakhpur Link Expressway on 20 June, 2025. Built at a cost of Rs 7,283.28 crore, the 91.352-km expressway connects National Highway-27 in Gorakhpur to Salarpur in Azamgarh, linking directly to the Purvanchal Expressway. This major infrastructure development is expected to significantly reduce travel time to key areas like Urwa, Dhuriyapar, Khajni, and Belghat.
The access-controlled expressway traverses four districts—Gorakhpur, Sant Kabir Nagar, Ambedkar Nagar, and Azamgarh, and is currently a four-lane road, with future provision to expand to six lanes. The route is equipped with advanced traffic management systems, including CCTV surveillance, automatic number plate recognition (ANPR), and speed monitoring systems. Constructed in two packages, APCO Infratech built the 48.317-km stretch from Jaitpur to Phulwaria, while Dilip Buildcon completed the 43.035-km segment from Phulwaria to Salarpur. The project involved land acquisition from 172 villages, covering 1,148.77 hectares.
This is the seventh expressway to become operational in Uttar Pradesh, with five completed in the last eight years—highlighting the state’s accelerated push for road infrastructure development.
