Illustrative image – not actual.The Uttar Pradesh Cabinet, chaired by Chief Minister Yogi Adityanath, has approved the execution of a tripartite memorandum of understanding (MoU) for the Lucknow Metro Phase-1B East-West Corridor project.
The agreement will be signed between the Central government, the state government, and the UP Metro Rail Corporation (UPMRC), defining the respective execution responsibilities of each entity. Pegged at a total cost of Rs 5,801.05 crore, the infrastructure project will be funded through an equal equity split between the Centre and the state government. The 11.165-kilometer transit line will connect Charbagh to Vasant Kunj, incorporating seven underground and five elevated stations. It is designed to navigate the densely populated areas of old Lucknow and will integrate with the existing North-South Corridor at Charbagh for seamless commuter transfer.
Additionally, the Cabinet has cleared the transfer of 550 sq. mtrs. of vacant nazul land in Agra Sadar to the UPMRC for station and viaduct construction under Corridor-II of the Agra Metro project.
