Illustrative image – not actual.Union Road Transport and Highways Minister Nitin Gadkari has announced a Rs 61,500 crore, 630-km highway corridor project to connect Siliguri in West Bengal with Guwahati in Assam and Shillong in Meghalaya.
Designed to combine new greenfield construction with existing road upgrades, the initiative aims to slash transit times and strengthen connectivity around the Chicken's Neck corridor. The project includes key stretches such as a 400-km Siliguri-Guwahati link costing Rs 30,000 crore, a greenfield section reducing travel time and the Shillong-Silchar highway slated for work orders in November. Additionally, a separate Gorakhpur-Siliguri expressway project is planned and the Ministry of Road Transport and Highways (MoRTH) is advancing this project and a Rs 8,970.20 crore four-lane access-controlled corridor between Guwahati and Tezpur under the BOT model.
These projects aim to halve travel times, double average speeds, and establish seamless, high-speed road connectivity between Uttar Pradesh, West Bengal, and Assam.
