Illustrative image – not actual.Mumbai Metropolitan Region Development Authority (MMRDA) has decided to appoint Delhi Metro Rail Corporation (DMRC) for conducting feasibility study of the proposed underground metro rail for Mumbai. MMRDA and DMRC are likely to enter into a memorandum of understanding soon. The feasibility study is expected to take three months for completion. The metro rail would cover Colaba to Kurla and Ghatkopar to Andheri. MMRDA has allocated Rs.3 crore for the study.
The authority has also appointed a German consultant for studying the feasibility of proposed sky train from the 10 km Ghatkopar Andheri stretch. The metro would be integrated with the existing suburban transport network.
Earlier, MMRDA had rejected the sky bus proposal connecting Andheri & Ghatkopar mooted by the Konkan Railway Corporation and the partially elevated and underground metro proposed for the Colaba Kurla stretch by Tata Consultancy Services.
mmrdametro