UHBVN to invest Rs.12 crore in power distributionIllustrative image – not actual.

Uttar Haryana Bijli Vitran Nigam (UHBVN) has earmarked Rs.12 crore to strengthen the power distribution system in Kurukshetra and Kaithal districts of the State during 2001-02.

 

As per plans, four 11 KV level over-loaded and lengthy feeders including  Narwal, Marcheri, Haripura and MITC Keorak would be bifurcated at an estimated cost of Rs.2.5 crore. About 268 existing over-loaded transformers would be augmented at a cost of Rs.81 lakh. Further, UHBVN also plans to release 15,000 domestic and non-domestic connections, 800 industrial connections and 1,100 tubewell connections at a cost of Rs.5 crore.

← All latest storiesBack to top →