Tuticorin Port Trust plans oil and cargo terminalIllustrative image – not actual.
ProjectsToday.com

Tuticorin Port Trust plans to construct a three-million tonne capacity oil and hazardous cargo terminal at the port. The project envisages the construction of a berth for handling various grades of bulk liquid chemicals and specialized grades of petroleum oil and lubricants and hazardous liquid cargo including refrigerated and pressurised liquefied gases.

The proposed oil terminals would be constructed within an island breakwater system north of north break water at a cost of Rs.1,800 crore.

Model studies for the design and layout of the island break water was carried out by CWPRS, Pune at a cost of Rs.12.41 lakh.

Oil companies like Indian Oil Corporation, Hindustan Petroleum Corporation, Bharat Petroleum and Reliance Petroleum have shown interest in this project which would be offered on BOT basis for 30 years.

← All latest storiesBack to top →