Illustrative image – not actual.Tuticorin Port Trust plans to construct a
three-million tonne capacity oil and hazardous cargo terminal at the port. The
project envisages the construction of a berth for handling various grades of
bulk liquid chemicals and specialized grades of petroleum oil and lubricants
and hazardous liquid cargo including refrigerated and pressurised liquefied
gases.
The proposed oil terminals would be constructed within an island breakwater
system north of north break water at a cost of Rs.1,800 crore.
Model studies for the design and layout of the island break water was carried
out by CWPRS, Pune at a cost of Rs.12.41 lakh.
Oil companies like Indian Oil Corporation, Hindustan Petroleum Corporation,
Bharat Petroleum and Reliance Petroleum have shown interest in this project
which would be offered on BOT basis for 30 years.
