Tuticorin Port invites tenders for feasibility studyIllustrative image – not actual.

Tuticorin Port Trust has reportedly invited tenders for preparing the feasibility report associated with the outer harbour development project at the port.

The report is expected to explore the possibility of, inter alia, deepening of the dock basin to cater to 14.5m draught vessels, formation of breakwater and construction of berths with other provisions such as electrical installations, port safety and fire-fighting facilities.

It would also have an initial environment and social impact analysis, preliminary site investigation based on earlier reports, stakeholder commitment and risk factors, it is learnt.

The report would also contain traffic forecast up to 2025, vessel traffic analysis and evaluation of optimised layout for the outer harbour, breakwater system, area requirement for berths, dock basin, turning circle, channel dimension (length, width, depth) and back-up area requirement.

The project, which is estimated to cost Rs.2,150 crore is part of the National Maritime Development Programme.

Tuticorin Port, which is an artificial harbour, has six alongside berths, one multipurpose berth, one container terminal, two coal jetties, one oil jetty and one shallow draught berth. The outer harbour is being developed to meet the port's future traffic requirements.

Also See:

Six bidders for Tuticorin container terminal (27-Aug-05)

← All latest storiesBack to top →