Trial runs commences on Sarai Kale Khan-New Ashok Nagar RRTS stretchIllustrative image – not actual.

The National Capital Region Transport Corporation (NCRTC) has commenced trial runs of the Namo Bharat train on a 4.5km stretch in Delhi, between New Ashok Nagar and Sarai Kale Khan, marking a significant milestone for the Delhi-Meerut Regional Rapid Transit System (RRTS) project. 

“The Namo Bharat train was brought from New Ashok Nagar to Sarai Kale Khan on the down line by the NCRTC team at a slow speed. The train was run manually to check the compatibility of the signalling system. As this test progresses, we will conduct a comprehensive evaluation to assess the integration and coordination of the train with various subsystems such as track, platform screen door (PSD), and overhead power supply system. Extensive trial runs including high-speed test of the train will be conducted in the coming days,” said an NCRTC official.

Currently, 55 km of the RRTS corridor is operational — from New Ashok Nagar to Meerut South — with nine stations in Uttar Pradesh and two in Delhi. Sarai Kale Khan is designated as the originating station for the RRTS corridor in Delhi. An official confirmed that Sarai Kale Khan station is nearing completion.

CRTC aims to operationalise the corridor up to Sarai Kale Khan by the end of June. Following a month of trial runs, the Commissioner for Metro Rail Safety (CMRS) is expected to certify the route within 15 days, paving the way for full-fledged operations.

← All latest storiesBack to top →