Illustrative image – not actual.
Authorities of Eastern Dedicated Freight Corridor (EDFC) have successfully conducted the trial run of the first loaded goods train in the last section of the corridor (38 km), from New Deendayal Upadhyaya (NDDU) Junction to New Dagmagpur, on 31 May, 2023. With the commissioning of this section, 80 percent of the EDFC has become operational.
This would be followed by a safety inspection in June, 2023 and then a green signal for regular operations in the stretch would be granted. With this, the 422 km section route of Prayagraj unit and 1,070 km track section of EDFC have become operational, enabling the freight trains to start running from Dadri to Pt Deendayal Upadhyaya (PDDU) junction. Overall, the connectivity of trains will be from Bihar (Son Nagar) to Sanand in Gujarat.
For the trial run, 58 coal-laden wagons were operated on the new double rail line track which is 39 km, and a goods train with 42 loaded wagons of wheat was operated to NDDU Junction.
In FY23, the work done under EDFC included New Ruma to New Sujatpur, Chunar to Cheoki, New Karchana to New Iradatganj, New Karchana to New Sujatpur, New Kanpur to New Bhimsen and New Bhimsen to New Bhaupur.
EDFC runs from Ludhiana in Punjab to Dankuni in West Bengal, covering a distance of 1,875 km.
