Illustrative image – not actual.Toshiba is planning to set up a power boiler plant at Ennore in Chennai, with an estimated cost of Rs.1,000 crore.
The company will set up boilers for a capacity of 15,000 MW. However, it is understood that such a level of capacity will be reached over time.
Toshiba is in talks with the state government's Transport Department and the National Highways Authority of India for strengthening certain stretches of the road connecting the proposed site to the Ennore port, so that it could bring the heavy equipment needed for the project.
Also See:
Toshiba, JSW Group to establish JV for turbines, generators (07-May-08)
