TOR granted for Ultra Mega Power ProjectIllustrative image – not actual.

A 4,000 MW Ultra Mega Power Project (UMPP) near village Kakwara, Taluk Katoriya, District Banka, Bihar, has been granted Terms of Reference (TOR) by the Expert Appraisal Committee (Thermal Power).
 
The proposal was considered by the EAC (thermal) during its 55th meeting held on 5 and 6 May, 2016 for determination of TOR for undertaking detailed EIA and preparation of EMP in accordance with the provisions of EIA notification dated 14 September, 2006 and its amendments.

The project is under the ownership of Bihar Mega Power and envisages setting up an ultra mega power unit (UMPP).

← All latest storiesBack to top →