Illustrative image – not actual.Tohoku Electric Power Co. is planning to withdraw its plan to build a new nuclear plant in Fukushima Prefecture.
Tohoku Electric apparently decided it was impossible to go through with the construction plan amid strong local opposition following the triple meltdowns at the Fukushima No. 1 plant. Tohoku Electric has been in the process of acquiring around 150 hectares of land in the town of Namie and Odaka Ward, Minamisoma, but has faced strong local opposition. The construction site was flooded with tsunami after the Great East Japan Earthquake, and the area was designated as a no-go zone.
Source: THE JAPAN TIMES NEWS
