Illustrative image – not actual.
Titagarh Rail Systems (TRSL) has announced the commencement of production of trainsets for Bangalore Metro Rail Corporation (BMRCL) Phase-II Yellow Line project, as part of a contract with China Railway Rolling Stock Corporation (CRRC).
The original contract between BMRCL and CRRC Nanjing Puzhen signed in December 2019, had faced challenges which led to delays. To address this, CRRC entered into a memorandum of understanding (MoU) with Titagarh Rail Systems. Under the MoU, Titagarh will manufacture 34 trainsets at its facility in Uttarpara, West Bengal. Only two trainsets, comprising 12 coaches, will be manufactured in China.
The 21-km Yellow Line, extending from RV Road to Bommasandra, is expected to enhance connectivity and reduce traffic congestion in Bengaluru.
