Three suburban stations set for a revampIllustrative image – not actual.

The Western Railways (WR) will be giving a complete makeover to three suburban railways stations in Mumbai.

The work is being carried out by the Mumbai Rail Vikas Corporation (MRVC) at a cost of Rs 103 crore under the Mumbai Urban Transport Project II. The three stations are - Andheri, Jogeshwari and Goregaon. The revamp work is being undertaken to facilitate the extension of Harbour line up to Goregaon and will entail major remodelling of these stations, including demolition of existing home platforms as well as booking offices for the laying of tracks. Among other things, escalators will be installed at the stations, each of which will also get a new platform. So far, the MVRC has completed 35 per cent work with completion slated for March 2014.

At Andheri, platform numbers six and seven, currently used for Harbour line services, will be demolished. A new home platform will be built north of the existing location to align it with other platforms. A single storey building with an area of 25,000 sq ft is being constructed. An elevated podium will house booking windows and other railway stalls. At Jogeshwari, there are two platforms which cater to north-bound slow services. The home platform at this station will also be demolished. Due to lack of space, there will be no home platform at this station. A new island platform will be built for Harbour line trains. The platform plan for Goregaon station will be more or less similar to that of Andheri. Goregaon will get a home platform and the existing one will become an island platform for CST/Panvel Harbour line and Borivli slow trains. Besides, a new station building similar to the one at Andheri will come up.

← All latest storiesBack to top →