Illustrative image – not actual.
Simplex Infrastructure, JKumar Infraprojects and NCC have bagged the contracts for different packages of the 16.5 km Andheri (East) to Dahisar (East) Metro-7 corridor in Mumbai.
Simplex Infrastructure has been awarded the contract to design and construct the first package consisting of an elevated viaduct and five elevated stations including Andheri (East), Shankarwadi, JVLR Junction, Mahanand and new Ashok Nagar.
JKumar Infraprojects has been selected to design and construct the second package consisting of an elevated viaduct and six elevated stations - Aarey, Dindoshi, Pathan Wadi, Pushpa Park, Bandongri and Mahindra & Mahindra.
NCC has bagged the contract to design and construct the third package consisting of an elevated viaduct and five elevated stations including Magathane, Devipada, National Park, Ovaripada and Dahisar(E).
The winning bidders will design and construct the entire corridor and all 16 stations within a period of 30 months.
