Illustrative image – not actual.Thermax, an energy and environment solutions provider, has bagged the contract for setting up a geothermal power plant in Maharashtra.
The company is likely to sign an MoU with the Maharashtra Energy Development Authority (MEDA) shortly in this regard.
As per the terms of the proposed MoU, Thermax will have to conduct a study to ascertain the availability of high temperature geothermal resources in the area. Once the study is done, the company will have to set up at least one 5 MW power plant as a pilot project in the region with a three-year time line. The proposed plant may come up in the Konkan region.
The state government has given its nod for signing of the MoU. The project is to be funded by Thermax with the state government playing only the role of a facilitator such as in providing land. However, the company will have to pay royalty to the MEDA. Also, it will have to give 10 per cent of the power generated to Maharashtra State Electricity Distribution Company.
Related Links:
Project Profile
