Thermax Group bags order worth Rs 279 crore orderIllustrative image – not actual.
The Thermax Group has secured a repeat order worth Rs 279 crore from a public sector fertiliser company for setting up a captive co-generation plant at Trombay.

The project is for a gas turbine generator (GTG)-cum-heat recovery steam generator (HRSG) based co-generation plant of 50 MW capacity on an EPC basis.

The company plans to install two units of GTG with HRSG to generate power and steam simultaneously.

The scope of work includes supply, design, engineering, manufacturing, construction and commissioning of the cogeneration plant. The project is to be completed in 24 months.

← All latest storiesBack to top →