Thermax bags Rs 545.6 cr order for flue gas desulphurisation systemsIllustrative image – not actual.
Thermax has concluded an order of Rs 545.6 crore from an Indian power public sector company to set up flue gas desulphurisation (FGD) systems for their two units of 500 MW capacity each in the state of Uttar Pradesh.

The scope of supply includes design, engineering, manufacturing, civil work, construction and commissioning of the FGD systems. The project is slated to be completed in 30 months.
← All latest storiesBack to top →