Thermax bags Rs 1,600-cr supply order for supercritical power plant in Central IndiaIllustrative image – not actual.

Thermax Babcock & Wilcox Energy Solutions, a wholly-owned subsidiary of Thermax has secured a boiler package supply order worth approx. Rs 1,600 crore for a 1x800 MW ultra-supercritical thermal power project in Central India.

The order was placed by a leading thermal power project developer in the region. The scope of work includes the manufacturing and supply of the boiler package, supervision of its installation and commissioning, and conducting performance testing to ensure operational efficiency. The project represents a significant addition to Thermax’s order book and showcases the company’s expertise in delivering advanced boiler solutions for high-capacity, energy-efficient power plants.

This assignment reinforces Thermax’s presence in the thermal power sector, particularly in ultra-supercritical technology, which supports higher efficiency and reduced emissions compared to conventional thermal plants. The successful execution of the project is expected to strengthen the company’s reputation for engineering excellence, timely delivery, and integrated solutions in the energy infrastructure segment.

← All latest storiesBack to top →