THDC extends bid date for wind power projectIllustrative image – not actual.
THDC India has extended the bid submission date for its 50 MW wind power project from 3 December 2014, to 6 January, 2015.


The techno-commercial bids will be opened on the same day.


All other terms and conditions for the tender will remain unchanged.


Bids have been invited for EPC contract of 50 (±01) MW capacity wind power project at a suitable site at any one of the wind potential states - Rajasthan / Madhya Pradesh / Gujarat / Maharashtra with its comprehensive operation and maintenance for 20 years.


The project is estimated to cost Rs 375 crore.

 

More Tender Info:
EPC Contract for 50 MW (±01) Wind Power Project

More Project Info:
Wind Based Power Project

← All latest storiesBack to top →