The Haryana Power Generation Corporation (HPGCL) has invited tenders from consultants for providing consultancy services for the 500 MW (2 x 250 MW) Stage II of the YTPP Yamunagar, either under the split packages route or on a turnkey basis.
The work of the consultant would include design, engineering, preparation of specifications and tender documents for various packages, evaluation of bids, inspection of material, supervision during construction, start-up and commissioning of the project.
Late date for submission of bids: 30 December 2002
More details could be obtained from the office of:
The Chief Engineer / Thermal Design,
Haryana Power Generation Corporation Limited,
SCO No. 21,
Sector 11,
Panchkula.
