Illustrative image – not actual.The Kolkata Port Trust has floated a global tender for capital dredging, shore disposal and construction of dykes and trimming as part of the river regulatory measures in the estuary of the Hooghly River. The project is estimated to cost Rs.290.36 crore.
This is the fifth time, since April 2001, that the
port authorities have floated a global tender for this job.
The work, as proposed in the present tender,
comprises 3 major elements as mentioned below:
·
Construction of dykes with geo-tubes, geo-textiles,
sand bags, boulders and other construction materials in the foreshore and also
behind the existing irrigation embankment from the upstream side of Balari
·
Capital dredging of a channel of 10-km long having a
bottom width of 200 metres at a dredged depth of 4.5 metres and the shore
disposal of the dredged material within the dyked area at a distance of 7.5 km
including pipeline
- The trimming of the western face of Nayachara
Island and disposal at a distance of about 5 kms on the eastern side of
the southern guidewall to be constructed by other agency.
The work is expected to be completed within 18
months.
Last date for
submitting the tender documents: 21 August 2002.