Package I -
Construction of railway underpass at
Ch.5.608 kmp through CCR line by box-pushing technique including both side approach
guide wall. The estimated cost of the package is Rs.6 crore and the time of
completion is 18 months.
The last date for submission
of pre-qualification documents is 30 May 2001.
Package II –
Construction of grade separated
interchanges at NH 34 junction. The estimated cost of the package is Rs.27
crore and the time of completion is 24 months.
The last date for submission
of pre-qualification documents is 4 June 2001.
Package III –
Construction of entire road and all
bridges of the expressway excepting NH 34 interchanges and railway underpass at
Ch. 5.608 kmp. The estimated cost of the package is Rs.75 crore and the time of
completion is 28 months.
The last date for submission
of pre-qualification documents is 4 June 2001.