Illustrative image – not actual.Western Coalfields (WCL) has issued a tender for handling, transport, and other mining services at the Kolgaon Expansion deep open cast (OC) mine in the Wani area.
The contract involves the removal of overburden (OB), coal extraction, and various other mining operations. The scope of work includes hard ob removal, bc soil/soft ob removal, overburden removal and handling, extraction and evacuation of coal and drain cutting and water sprinkling The project will require the hiring of heavy mining equipment (HEMM), including tippers, drills, dozers, motor graders, and water sprinklers. Tasks will involve drilling, excavation, loading, transporting, dumping, spreading, dozing, grading, and water sprinkling in all types of strata.
The bid is based on percentage quotes, and the duration of the contract is 31 months. Interested bidders must submit their proposals by 06 April 2026.
