Illustrative image – not actual.
The Uttar Pradesh Power Transmission Corporation has invited bids for construction of transmission lines.
The scope of work involves construction of approximately 641 km of 220 kV SC/DC transmission lines with ACSR Zebra & 132 kV SC/DC lines with ACSR Panther in the state on turnkey basis (Package 1 & 2).
The estimated cost of the project is Rs 212 crore.
